|
The BTC Pipeline will be the primary export route for oil and other liquid hydrocarbons produced in Azerbaijan and elsewhere in the Caspian region.
The Project is comprised of a 1,768 km pipeline designed to have an ultimate capacity of one million bpd (and a 95% load factor). The Pipeline runs from the Sangachal terminal (near Baku, Azerbaijan) through Tbilisi, Georgia to the new Ceyhan marine terminal on the Mediterranean coast in southern Turkey.
In June 2002, CIECO established ITOCHU Oil Exploration (BTC) Inc. in order to acquire a 3.40 % interest in the BTC Pipeline Company.
The BTC Pipeline became operational in June, 2006.
|